CLIENT PROCESS
The initial steps taken toward site development will involve the compilation of a Scope of Work Document which is presented to the site owner for approval.
After the client signs the Scope of Work Document, Provarko will proceed with the site layout and structural drawings. Upon engineer review and approval of the structural drawings, the mechanical and electrical drawings are completed.
Site preparation in the form of earthwork is conducted while the materials and equipment are on order. Construction continues upon receipt of materials and equipment on site.
Installation proceeding during the construction phase includes field piping, digester piping, biogas flare, digester pumps, digester electrical, generator and piping, hot water system, gas piping, utility building electrical, and the separator system.
Our services also include start-up, digester operations, troubleshooting, training, and comprehensive after-sales support.